Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Home
>
US Coast Guard Command Instructions
>
> Project Outline - Example
Responsibility-cont. - CI_4000_130004
Project Outline - Example-cont. - CI_4000_130006
Headquarters Materiel Management Projects at the Engineering Logistics
Page Navigation
1
2
3
4
5
6
7
8
9
10
Enclosure
(1)
to
COMDTINST
4000.13
PROJECT
OUTLINE
-
EXAMPLE
THIS
PROJECT
OUTLINE
IS
AVAILABLE
IN
ELECTRONIC
FORMAT
FROM
COMMANDANT
(G-SEN).
Project
outline
approval
is
required
prior
to
establishing
a
project
at
the
ELC
and
prior
to
project
materiel
being
shipped to
the
ELC.
1.
Assignment
of a
service-wide
Project
Code
is
required
for
the
following
project.
a.
PROJECT
TITLE:
SCCS-210
(V2)
Upgrade.
b.
JUSTIFICATION
:
The
purpose of
this
project
is to
stage,
and
issue
installation
kits
for
the
Shipboard
Command
and
Control
System
aboard
the
210'
WMECs
upgrade
project.
These
kits
include
the
tactical
computer,
peripherals
to
support
two
operation
positions
(monitors,
keyboard
,
and
trackballs),
a
printer,
and a
sensor
serial
interface.
The
prototype
for
this
system upgrade was
installed
aboard
CGC
COURAGEOUS
to meet
G-OCU
articulated
requirements.
c.
MATERIEL
APPLICATION:
The
proposed
equipment
will be
installed
on
the
210'
Medium
Endurance
Cutter
class.
d.
TOTAL
NUMBER
OF
PROJECT
UNITS:
(1)
The
following
equipment
comprises a shipset (
please
identify
any
hazardous
materiel
items
).
Abbreviated
EXAMPLE
Supplier
CLIN/PN
DESCRIPTION
QTY
COST
EA
TAC-4
0023A
Processor
A:w/64MB
RAM
1
,800.00
TAC-4
0049AA
CD-ROM
1
200.00
(a)
Total
Cost
for
15 Shipset
0,000.00
(2)
The
following
equipment
compromises
the
fleet
spares:
1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business