COMDTINST 5270.2
d. The following implementation schedule will be followed:
(1) NLT 30 September 2004: All units required to track training per paragraph (7) of this
Instruction shall fully implement TMT.
(2) To be Determined: Major cutters and units with less than 256 kbps dedicated CGDN+
connectivity shall fully implement TMT within three (3) months of the successful
development and installation of "AOPS/TMT Lite" (estimated deployment in Summer 2004).
This software solution will enable bandwidth-constrained units to make AOPS and TMT
entries locally and later synchronize with the AOPS/TMT central database. A listing of these
units will be provided at a future date.
(3) NLT 10 September 2004: Automatic updating of competencies from TMT into Direct
Access will be completed.
e. Units that implement TMT are exempt from GMT reporting requirements promulgated by
Headquarters Program staffs (e.g. Sexual Harassment, Civil Rights, Suicide Prevention,
Financial Responsibility, Credit Card Training, etc reporting requirements are lifted). All
requirements to maintain local paper-based training records are hereby lifted for training
captured in TMT. However, requirements set forth by reference (e) and (f) remain in effect.
f. Commandant (G-OCC) will ensure TMT data is kept in an accessible electronic format for a
minimum of five (5) years after completion of the training. (No action required by field units.)
10. ENVIRONMENTAL ASPECT AND IMPACT CONSIDERATIONS. Environmental
considerations were examined in the development of this Instruction and have been determined to be
not applicable.
11. FORMS/REPORTS. None.
T. W. ALLEN /S/
Chief of Staff
5