Encl. (1) to COMDTINST 4105.4
c.
Cutter Support Reviews (CSRs), as described in enclosure (3), will be coordinated by
Supply Center Curtis Bay (SCCB). The CSR will meet for the purpose of reviewing
and finalizing the CCMPs and developing Commodity Management Plans (CMPs). The
lead MLC, with assistance from SCCB, shall publish changes/revisions to the CCMPs
that result from those reviews.
d.
Commodity Management Plans (CMPs) shall be developed to support critical line items,
as designated by specific CCMPs. CMPs provide specific guidance for item managers,
provisioners, MLCs, and platform managers on how critical systems are to be
supported. CMPs will be developed at the CSR using the CCMPs. Final CMP will be
signed by the lead MLC and SCCB. Enclosure (5) is the CMP format.
e.
Long Range Maintenance Plans (LRMPs) are cutter specific and provide guidance on
maintaining the cutter's major equipment. The LRMP is a five year planning document
developed by the MLCs.
4.
Responsibilities.
a.
Commandant (G-ENE) shall provide maintenance policy and guidance on requirements
for cutters and standard boats. G-ENE shall initiate the scheduling of the CSR and
ensure all preparation work is complete.
b.
Commandant (G-ELM) shall provide overall Coast Guard configuration, logistics, and
supply support policy.
c.
MLC(v)s shall coordinate maintenance availabilities, SHIPALTs, and other depot level
repairs with Headquarters Facility Managers. MLCs develop and maintain LRMPs.
The lead MLC is responsible for coordinating the development and maintenance of
CCMPs for their designated cutter classes. After the review process is complete and
changes made, the MLCs will publish the updated CCMPs.
d.
Supply Centers shall be responsible for the development of CMPs for each critical line
item selected by the CSR for each cutter class requiring support. The Supply Centers
are responsible for staging Coast Guard managed parts and expeditiously shipping the
requested parts to the designated maintenance availability site by the due date after the
requisitions are received. SCCB will host the CSR and is responsible for insuring all
attendees are contacted for the convening dates.
2