Enclosure (4) to COMDTINST 11103.11B
1.4 Methodology:
(Identify the basis for identifying and including specific items within the Master
Plan and how the framework was developed.)
2.
BACKGROUND:
2.1
History
(Provide brief narrative describing quarters history as far back as possible; provide
year any past and current Representational Facilities were acquired or removed
from CG property inventory. Describe any pertinent rationale to change or upgrade
the facility.)
2.2
Site Demographics
(Describe the surrounding area, topography, proximity to metropolitan areas,
distance from other military facilities, etc. Insert vicinity map as Figure A.)
2.3
Geologic Setting
(Describe the geological characteristics of the site including bedrock, predominant
soil types, and effects of erosion. Seismic characteristics and groundwater
information should also be provided here.)
3.
FACILITY ASSESSMENTS:
3.1
Structures
(1. Provide detailed information on the type of construction, materials used,
condition of individual building elements, and breakdown of structural
improvement/major renovation projects completed in the past describing what was
completed and why. Assess the adequacy and condition of the architectural
features. Note any rehabilitation work or modifications made. Discuss any actual
or potential problems with foundations, roofing, etc. 2. Provide color pictures
[digital format] along with narrative of rot, deterioration, mold, member failure, or
other structural defect/problem discovered. 3. Include a room-by-room description
identifying function, size, finishes, unique characteristics, and pictures of problems
identified. 4. Include separate specific information on out-buildings [garages,
sheds, etc] over 100sqft ).
Note: General pictures of rooms and exterior elevations are included in the
Resident's Guide, and should not be provided as part of the Master Plan.
Pictures provided should only show damage/problems identified during
inspection.