Encl. (4) TO COMDTINST 16478.12
First CG District ATON Battery Recovery Site Safety Plan
work practices prior to entering the site.
E.3
All persons shall observe the buddy system while on site.
E.4
Medical Monitoring:
E.4.a. Based on the hazard evaluation conducted by the SSHP, after
consultation with the SSHO, a determination on personal
monitoring of people in Level A, B or C will be made. Any
evaluation rating higher than a Level D response shall be
referred to the ATON Battery Project Officer and SSHO.
E.5
are anticipated at this site. Should control zones be established,
all zones should be marked on the site map (Attachment 01).
E.5.a.
The HOT ZONE, or EXCLUSION ZONE, is the area where
contamination or battery splash hazards are expected.
(1) The site safety and health supervisor shall maintain
a hot zone boundary based on the most recent site
characterization and monitoring information.
(2)
Any needed hot zone is marked at the site as follows:
_________________________________________
_________________________________________
_________________________________________
E.5.b.
transition area between the HOT ZONE and the COLD ZONE.
It is the area where a DECONTAMINATION CORRIDOR is
established to remove possible contamination from
personnel and equipment leaving the HOT ZONE; and it
provides a safety buffer for accidents or migration of
(1)
The site safety and health supervisor shall maintain
a warm zone boundary based on the most recent site
characterization and monitoring information.