Encl. (4) TO COMDTINST 16478.12
First CG District ATON Battery Recovery Site Safety Plan
E
Time
F
Initials of sampling personnel
C.4. AFTER ACTION REPORT Upon completion of on-site activities, an after
action report(format provided in attachment 12) shall be completed and
forwarded along with the soil samples to CEU Providence. Copies of the
Site Plan and first page of the Site Safety Plan will be forwarded to
the project officer. Ensure locations of all observed but un-recovered
batteries are noted.
C.5. RECORD KEEPING
Record keeping serves several important functions including regulatory,
operations, environmental and planning. The most important records are
the Training records, site plan, the photographs, the chain of
custody/sample documentation and the bill of lading/waste manifest.
Units are required to scrupulously maintain these records.
D. Site Organization:
D.1
Definitions and Key Personnel: A diagram of the command and control
structure for this response is included as attachment 5.
D.1.a Recovery Coordinator: The recovery coordinator (RC) is the
designated official responsible for incident/recovery management. The
RC for this site is:
Commander First Coast Guard District (oan) 408 Atlantic Ave., Boston, MA
02110 Phone: 617-223-8337
D.1.b
The Site Safety and Health Officer (SSHO), often referred to as
the Site Safety Officer (SSO), is the singel individual responsible for
developing and implementing the OSC's Site Specific Safety and Health
Plan, in accordance with 29 CFR 1910.120. The SSHO for this incident
is:
Commander (mseh)
First Coast Guard District
Boston, MA
Phone (617) 223-8436
D.1.c
Site Safety and Health Supervisor(s) (SSHP): A mandatory position under
29 CFR 1910.120. The SSHP, often referred to simply as the Site Safety
PAGE 11