Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Home
>
US Coast Guard Command Instructions
>
> Site Control - CI_16478_120131
Site Organization - CI_16478_120130
Medical Monitoring
National Plan for Aton Battery Recovery and Disposal - index
Page Navigation
109
110
111
112
113
114
115
116
117
118
119
Encl. (4) TO COMDTINST
16478.12
First CG District
ATON
Battery
Recovery
Site Safety Plan
Supervisor, is the individual(s) in the field responsible for
enforcing the
SSHO's
site-specific site safety
and
health plan,
coordinating all safety
and
health
concerns
for the work site,
keeping this plan current
and
coordination with site safety
officers from other organizations. An SSHP
must
be on-site at all
times while the
SSHO
may
be with the
OSC
or at other locations. In
instances
where
more
that
one
individual is designated to act as
SSHP,
a single individual
must
be designated as the lead or senior
SSHP.
As this site is not expected to contain
any
air contaminates over
permissible
exposure
limits
and
recovery operations should
pose
minimal splash hazards
and
personnel safety
hazards,
SSHPs
shall
only permit the
use
of splash gear including tyvek coveralls. If
personnel require higher than level D protection, the SSHP shall
contact the
SSHO
and
Recovery
Project Officer immediately. All
SSHPs
shall be trained on
how
to conduct environmental sampling
and
how
to conduct hazard
assessment
on site.
D.1.d
.
The
designated
SSHPs
at this site as listed on
page
2, is the senior
person
on-scene, E-6 or above. For the
purpose
of this recovery,
the site supervisor
and
site safety
and
health supervisor are the
same
individuals.
D.1.e.
Public Affairs: Provided through the
Coast
Guards
First District
Public Affairs office at (617) 223-
8515
(Boston) or
(212)688-7144
(New
York).
D.1.f.
Hazardous
Waste/State Liaison:
Civil Engineering Unit Providence
300
Metro Center BLVD
Warwick, RI (401)
736-1744
D.1.g.
First District
ATON
Battery Project Officer is assigned to the First
District (oan)
and
is the
POC
indicated on the
accompanying
ATON
Order.
E.
SITE
CONTROL
E.1
Anyone
entering or
departing
the work area or
any
associated
control
zones
shall report to the site supervisor.
E.2
No
person
is allowed to enter the work area without subscribing to
this Site Safety Plan. All
persons
entering the site shall
have
proper training as described below. All personnel
PAGE
12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business