Enclosure (4) to COMDTINST 7310.1J
HOURLY STANDARD RATES FOR POLLUTION CLEAN-UP EQUIPMENT
Rate Application
Apply these charges for every full or fractional hour of use, excluding transit time. Make separate charges
for: (1) cost of Coast Guard Strike Team personnel operating and/or supervising the operations of the
equipment based on the standard rates for personnel, enclosure (2); (2) actual fuel costs associated with
operational use of the equipment; (3) the cost of transporting the equipment to and from the job site; and
(4) actual reimbursement cost when performed by a contractor. To obtain cost guidance on any other
equipment not listed below contact G-RPP.
HOURLY STANDARD RATES FOR POLLUTION CLEAN-UP EQUIPMENT
Equipment Type
Rate
Equipment Type
Rate
Voss System Trailer
8
Fast Sweep Boom
DESMI 250 Skimmer and Control Std
Large Pump System w/ Trailer
4
High Speed Skimmer
Small Pump System
Deutz Prime Mover
Non-Submersible Pumps
Highstar Prime Mover
Storage Inflatable Barge
CCN-150 Pump
Boom Mooring System
DOP 250 Pump
Dracone Off-Loading Pump Systems
6
650 Ft Inflatable Boom (1 reel)
Storage Seaslugs
9
Inflatable Boom (5 reels) w/ Trailer
0
Pollution Response Trailers
9
Command/Comms Offices
500 ft Foam Boom
500 ft Foam Boom, 3 Boxes w/Trailer
1