Encl. (1) to COMDTINST 4100.7
Engineering Logistics CONOP
Continually evaluates/improves the performance of the logistics system.
3.
Configuration Control Board
Cross-functional team that reviews proposed configuration changes in response to
changing facility requirements
Ensures appropriate ILS elements are addressed.
Makes decisions based on trade-off, cost-benefit and value-added analyses.
Communicates approved changes.
4.
Integrated Logistics Support Management Team (ILSMT)
Cross functional team that develops, reviews and updates Integrated logistics support
plans in response to changing operational and logistical requirements.
Ensures that appropriate ILS elements are addressed.
Reviews and ensures that all support plans are current.
Develops support plans for major acquisitions, alterations, modifications, and changes
in operational requirements.
5.
Acquisition Manager
Acquires a platform, system, or equipment, which is supportable throughout its life
cycle.
Leads cross-functional teams to ensure all life cycle ILS elements are included in
acquisition.
Ensures that the equipment or platform acquired meets the sponsor's requirements.
Makes decisions based on trade-off, cost-benefit and value-added analyses.
At delivery ensures that all planned support is in place to commence the operational
phase.
Chairs the configuration control board through the Acquisition Phase of the platform,
system, or equipment.
Chairs ILSMT through Acquisition Phase of the platform, system, or equipment.
CH-1
10