WORKSHOP ATTENDANCE REPORT - CGAUX-30
A.
GENERAL-This form is to be used to report all required National
Workshops.
B.
SECTION I-WORKSHOP TYPE-Place a check in the appropriate box next
to the national workshop given. Some of the workshops listed are
under development.
1. WORKSHOP DATE-Enter the date in MM/DD/YY format.
2. ATTENDANCE HOURS-Enter the lapsed time, in hours, for the workshop.
C.
SECTION II-ATTENDEES-Enter the names of each attendee and on the last
line enter the Instructor's name also as an attendee.
1. Member Number-Enter the member number of each attendee.
2. Last Name-Enter the last name of each attendee.
3. First Name-Enter the first name of each attendee.
4. Trainee-Circle either (Y)es or (N)o for trainee status.
If attendance is required of attendees be certain to circle (Y)es.
5. Instructor's Signature-the Instructor signs on this line.
6. Date-Instructor enters the date of the report in MM/DD/YY/format.