Encl. (4) TO COMDTINST 16478.12
First CG District ATON Battery Recovery Site Safety Plan
ATTACHMENT 8:
DECON LAYOUT
.11A
PAGE 1
4/93
EQUIPMENT NEEDED (LEVEL D)
STATION 1:
EQUIPMENT DROP / OUTER, RAIN GEAR, GLOVES, AND KNEE WADERS WASH &
RINSE:
____ chem wipes, spray bottle, paper towels (equipment DECON, at
equipment drop)
STATION 2: PROTECTIVE SUIT WASH/RINSE:
____ garden hose/spray apparatus capable of spraying contaminated areas
if suit is to be used more than once
____ garbage bag for one use suits
STATION 3: OUTER BOOT/GLOVE REMOVAL:
____ garbage bag
STATION 4: GLOVE/BOOT/BOOTIE REMOVAL:
____ garbage bag
STATION 5: RESPIRATOR STATION: (as needed)
____ wash with cleaner/sanitizing solution
____ plastic carrying bag
STATION 6:
MEDICAL MONITORING STATION: (as needed)
____
stool or seat
____
medical monitoring equipment
____
1st AID KIT