Enclosure (1) to COMDTINST 16114.20
Phase 2 (Interim Force to Future Force):
The RB-S will provide the secondary multi-mission capability at response units. The
transition strategy for this capability is to establish an OE-funded service-wide
commercial contract for RB-S and to replace non-standard boats that come out of service
with standard boats from this contract.
The standardized RB-S will replace most UTLs during the acquisition phase, though some
may be replaced by RB-Ms depending upon the projected future capability need of the
unit. Unit boat allowance changes will be initiated as each RB-M or RB-S is delivered.