*** ALLOWANCE QTY IS PER CUTTER VISE PER REPAIR LOCKER ***
ITEM
1
2
3
4
5 (UI)
COMMENTS
ONE COMPLETE ACCESSORY KIT PER PUMP.
P-250 OR P-100 PUMP ALLOWANCE
*3
2
2
1
1
CONTENTS LISTED BELOW.
KT
* WAGB AND WHEC REQUIRE 4
QUANTITY REQUIRED
KIT CONTENTS LIST
STOCK NUMBER
AR
HEARING PROTECTION
6515-00-137-6345
ONE PAIR FOR EACH PUMP TEAM MEMBER
NOZZLE -
1
VARI-PATTERN 1 1/2"
HOSE ASSEMBLY,
2
1-1/2" X 50'
HOSE ASSEMBLY,
1
2-1/2" X 50'
HOSE ASSEMBLY-HARD
3
RUBBER SUCTION,
3" X 10'
HOSE ASSEMBLY, NON-
1
METALLIC 2-1/2" x 18"
HOSE ASSEMBLY,
1
USED ONLY WITH P-250 MOD 1
HOSE ASSEMBLY,
2
4402311
USED ONLY WITH P-100.
SPECIAL TRI-GATE, 2-1/2"
INLET x TWO 1-1/2"
1
OUTLETS x ONE 2-1/2"
OUTLET
USED ONLY WITH P-100.
DOUBLE FEMALE SWIVEL,
AR
AC725-3025
ONE ADAPTER FOR EVERY TWO PUMPS
2-1/2" NH x 3"NH
FOR TANDEM OPERATION.
USED ONLY WITH P-100
AR
COLD WEATHER KIT
UN-42.5LWD
SEE APPENDIX A FOR ORDERING INFO.
2
WRENCH SPANNER
5120-00-293-1602
VALVE, FOOT/STRAINER,
1
SUCTION HOSE
SILICONE COMPOUND
1
5OZ.
FUEL TANK,
1
USED ONLY WITH P-250 MOD 1
(6.0 GALLON)
FUEL CONTAINER,
USED ONLY WITH P-100
1
(2.25 GALLON)
SEE APPENDIX A
CHAPTER XXIV CBR EQUIPMENT
ALLOWANCE REQUIREMENTS WILL BE PROMULGATED VIA FUTURE MESSAGE OR INSTRUCTION
CHAPTER XXV CBR MONITORING KIT
ALLOWANCE REQUIREMENTS WILL BE PROMULGATED VIA FUTURE MESSAGE OR INSTRUCTION
CHAPTER XXVI CBR GROSS DECONTAMINATION TEAM KIT
ALLOWANCE REQUIREMENTS WILL BE PROMULGATED VIA FUTURE MESSAGE OR INSTRUCTION