Encl. (6) to COMDTINST 4105.4
Naval Engineering Project Listing (NEPL). Cutter specific listing of all required maintenance for a
cutter not accounted for in the cutters PMS.
Operational Logistics Support Plan (OLSP). A logistics document that identifies the logistics
support for an individual cutter class and is provided to the Headquarters Facility Manager. The
OLSP is developed by the Project Manager/Officer and is turned over to the Facility Manager 90
days prior to the first introduction of the platform or equipment.
Preventative Maintenance System (PMS). The minimum maintenance requirements and
procedures for equipment aboard cutters. Procedures such as inspecting, cleaning and
reconditioning machinery and equipment to counter the effects of the hostile seagoing environment
and operating wear and tear.