Enclosure (6) TO COMDTINST 16478.12
USCG SITE SAFETY PLAN/ATON BATTERY RESPONSE PROJECT
RECOMMENDED ATTACHMENTS
ATTACHMENT
(1)
Platform AtoN battery capacity.
ATTACHMENT
(2)
Signature page for personnel on this project
ATTACHMENT
(3)
Site map for platform
ATTACHMENT
(4)
Hazardous substance information
ATTACHMENT
(5)
Head Stress guidelines
ATTACHMENT
(6)
Cold Stress guidelines
ATTACHMENT
(7)
Small Boat Operations guidelines
ATTACHMENT
(8)
A guide to safe work practices for lifting
ATTACHMENT
(9)
Decontamination diagram
ATTACHMENT
(10)
Site sampling protocols (if required)
ATTACHMENT
(11)
Diving Safety Plan
36