Enclosure (6) TO COMDTINST 16478.12
USCG SITE SAFETY PLAN/ATON BATTERY RESPONSE PROJECT
prescribed decontamination and a buffer between the support
area and hot area for reduction of airborne, solid and liquid
E.5.c. SUPPORT/COLD area: The remainder of the diving platform and
the 1000 yard exclusion area shall serve as the support/cold
area.
1)
This area will include a safe egress from the hot and warm
areas for evacuation from the work vessel.
2)
This area will include a safe observation area for
supervisory and support personnel.
3)
This area will be maintained as a clean, uncontaminated
area with no measurable or observable airborne hazards,
dust, or liquid chemical hazards.
E.5.d. The above areas shall be marked as needed to control traffic
procedures. The Coast Guard Site Safety and Health Officer
and/or Site Safety Supervisor(s) shall periodically inspect
work areas to ensure the effectiveness of boundaries.
E.6.
Attachment (3).
E.7.
TRAINING: In general all personnel on site must have adequate
training to do their jobs safely. This includes the
fundamentals of site safety and safety conscious operational
training. An ongoing training program to reinforce and build
upon previous training is also required (i.e., annual refresher
training).
E.7.a. REGULATORY REQUIREMENTS: Barring on site emergencies, this
project is classified as a post-emergency response operation.
General requirements are described in 29 CFR 1910.120.