Encl. (4) TO COMDTINST 16478.12
First CG District ATON Battery Recovery Site Safety Plan
ATTACHMENT (11) AFTER ACTION REPORT
SAMPLE
From:
Unit
To:
Commanding Officer, Civil Engineering Unit Providence
Subj:
BATTERY RECOVERY AFTER ACTION REPORT
Ref:
(a) ATONORD 01-XXX-94
1.
Per reference (a), ANT Saugerties was directed to conduct battery recovery
operations on the following sites:
a. Upper Hudson River LT 83
b. Turkey Point Buoy Depot (abandoned 1965)
2.
Site survey conducted on 31 Aug 94 by unit personnel as part of the First
District ATON battery recovery training program. The site safety plan,
photo documentation and soil samples are enclosed.
3.
The clean up of the site was completed on 31 AUG 94, utilizing D1 trained