Encl. (4) TO COMDTINST 16478.12
STANDARD SITE SAFETY PLAN FOR
ATON BATTERY CLEANUP OPERATIONS
(INITIAL RESPONSE PHASES-POST-EMERGENCY)
INDEX:
pg_02 A
SCOPE AND APPLICATION
pg_02 B
SITE DESCRIPTION
pg_04 C.
WORK PLAN AND ENTRY OBJECTIVES
pg_11 D.
SITE ORGANIZATION
pg_12 E.
SITE CONTROL
pg_15 F.
HAZARD EVALUATION
pg_22 G.
GENERAL SITE SAFETY AND HEALTH PROCEDURES
pg_24 H.
PERSONAL PROTECTIVE EQUIPMENT (PPE)
pg_24 I.
DECONTAMINATION PROCEDURES
pg_24 J.
SANITATION & PERSONAL HYGIENE
pg_25 K.
EMERGENCY PROCEDURES
pg_26 L.
pg_26 M.
SITE SAFETY MEETINGS
pg_27 N.
AUTHORIZATIONS
ATTACHMENTS
__________________________________________________________________
(01)
SITE PLAN
(file
02)
(02)
SAFE WORK PRACTICES FOR LIFTING/HANDLING BATTERIES
(file
24)
(03)
DRUM HANDLING & STORAGE PROCEDURES
(file
24)
(04)
WORK PLAN MODIFICATIONS
(file
09)
(05)
COMMAND AND CONTROL DIAGRAM
(06)
GENERIC HAZARDOUS SUBSTANCE INFORMATION SHEETS
(file 01A)
MSDS/RIDS/CHRIS/CHEMTOX/TOMES)
(07)
PPE ENSEMBLE SHEETS (Level D)
(file 13)
(08)
DECON LAYOUT
(file 11A)
(09)
SANITATION REQUIREMENTS
(file 06)
(10)
PROCEDURES FOR BITES, STINGS, & POISONOUS PLANTS
(file 23)
(11)
AFTER ACTION REPORT FORMAT
(12)
ADDITIONAL FIRST AID KIT CONTENTS
REV 9/19/94
PAGE 1