Encl (1) TO COMDTINST 16450.32A
Critical Area Review Checklist
March 27, 1994
Facility Spill Mitigation Procedures (33
CFR 154.1035(b)(2);
NVIC 7-92, Sec. 8(b)(2))
Does the plan describe the volume(s) of
Yes
No
Pg.
group(s) that would be involved in the --
___
___
___
Average Most Probable Discharge?
___
___
___
Maximum Most Probable Discharge?
Quantity__________
___
___
___
Worst Case Discharge?
Quantity__________
Does the plan include procedures for facility
personnel to mitigate or prevent any
discharge resulting from operational
activities associated with internal or
external facility transfers including
specific procedures to shut down affected
operations, in the event of
___
___
___
Failure of manifold
___
___
___
Transfer system leak
___
___
___
Tank overflow
___
___
___
Tank failure
___
___
___
Piping rupture
___
___
___
Pipe leak
___
___
___
Explosion or fire or both
___
___
___
Equipment failure
(NOTE: These events may be combined in the plan's
discussion. Reference to a manual or standing orders satifies
this requirement.)
Comments:
7