Encl. (1) to COMDTINST 16200.3A
Table 1-D (cont'd)
Recommended Penalty Levels
Specification
Nature of Specification
First
Second
Maximum
Cargo Handling
46 CFR 35.35(1)
General: Except as noted
||content||
,000
,000
below, any violation of
,000
regulations in this
subpart.
46 CFR 35.35-10(1)
Scuppers and Sea Valves:
,000
,000
Not properly secured during
,000
transfers.
46 CFR 35.35-20(1)
Inspection Prior to Cargo
,000
,000
Transfer: Failure to
,000
inspect, or inadequate
inspection.
46 CFR 35.35-40(1)
Conditions, Prohibiting
,000
,000
Cargo Transfers:
,000
Conducting cargo operations
during severe electrical
storms or with fires on the
wharf or tanker.
Vapor Control Systems
46 CFR 39(1)
General: Except as noted
,000
,000
,000
below, any violation of
regulations in this part.
46 CFR 39.10-13(1)
Submission of Designs,
0
||content||
,500
,000
Vapor Control Systems:
Failure to submit.
31