Task 2: Develop ASA Test Items and Exercises. Develop test items, exercises, and answers
and incorporate SME feedback. A formal test will be presented at the end of the
instruction. This test will be competency-based with 100% accuracy required for successful
completion. The ASA Test Item Report will provide test items with correct answers. The test
items will test for the specific knowledge and skills identified by the enabling objectives
and the specific content points from the SME interviews. The test items, including answer
keys, will be validated by DFAC SMEs during the review process, based on their
experience with the content, target population and the existing methods. The ASA Test Item
Report shall include a cross reference of test items to learning objectives provided in the
Lesson Specifications Report for ASA, which shall be provided to the Contractor as GFE.
Deliverable: ASA Test Items Report based on the approved objectives and the final Media
Design Report. Submit 36 copies of the Draft Report. The Government shall have five
working days for review and comment of the draft document. DFAC and the Contractor
shall then review consolidated comments. Changes that are mutually agreed to shall be
incorporated into the final deliverable under Task 4, Develop ASA Script. Changes that are
mutually agreed to shall be incorporated into the final report. Should such changes exceed
10% of the content, impact the number of courseware hours, the design complexity
assumed in this plan, or contract cost and /or schedule, the Contractor shall identify such
impact under the terms of the Changes clause of the contract.
Task 3: Develop Fiscal Law Test Items and Exercises. Develop test items, exercises,
answers and incorporate SME feedback. A formal test will be presented at the end of the
instruction. This test will be competency-based with 100% accuracy required for successful
completion. The Fiscal Law Test Item Report will provide test items with correct answers.
The test items will